duhitsmadi3890 duhitsmadi3890
  • 15-02-2024
  • Business
contestada

Question: A project being analyzed by PERT has 38 activities, 16 of which are on the critical path. If the estimated time along the critical path is 90 days with a project variance of 25, what is the probability that the project will be completed in less than 100 days?

Options:
A) 0.25
B) 0.50
C) 0.75
D) 1.00

Respuesta :

Otras preguntas

I need help what’s the answer?
The thin outer layer of the skin is called the _____. endodermis dermis fatty layer epidermis
What is the height, x, of the equilateral triangle shown?
A company has total revenue of $50,000,000, cost of sales of $40,000,000, operating expenses of $5,000,000, and financing costs of $2,000,000. What are earnings
According to the rational root theorem what are all potential rational roots of F(x)=9x^4-2x^2-3x+4
Why is the Kathmandu nijgadh expressway important for people present any four benefits that they can gain from the project
Second time posting this. Please help!! :)
A satellite measures a spectral radiance of 8 Watts/m2/um/ster at a wavelength of 10 microns. Assuming a surface emissivity of 0.90, what would be the estimated
Solve the equation P=s+t+r for s.
In the diagram below, AB is parallel to ¿o. What is the value of x?