Job 303 includes direct materials costs of $550 and direct labor costs of $400. If the predetermined overhead allocation rate is 40% of direct labor cost, what is the total cost assigned to Job 303

Respuesta :

Answer:

180

Explanation: Divide 550 and 400 and equal 40% over x