The water level of a creek has risen 4 inches above its
Flood stage. If it continues to rise steadily at 2 inches per
hour, how long will it take for the creek to be 12 inches
above its flood stage?

Respuesta :

I will take 4 hours for it to be be 12 inches above its flood stage

Answer:

4 hours

Step-by-step explanation: