At a construction site, a crane lifts an object to a certain height in 12 seconds, and a second crane does the same work in 6 seconds. Compared to the power developed by the first crane, the power developed by the second crane is which of the following?

A. The same

B. One-half as much

C. Twice as much

D. Four times as much