specifies when the labor, equipment and facilities are needed to produce a good or to provide a service. group of answer choices scheduling dispatching shop floor control loading

Respuesta :

The timing of scheduling determines when workers, facilities, and equipment are required to create a product or deliver a service.

What is meant by scheduling?

  • Process scheduling plays a significant role in multiprogramming operating systems. It is the procedure of erasing an active task from the processor and inserting a new one in its place.
  • It breaks down a process into states like ready, waiting, and running. Scheduling is the process of allocating resources to complete tasks in computers.
  • The resources could be expansion cards, network links, or CPUs. The tasks could be processes, data flows, or threads. A process called scheduler performs the scheduling operation.
  • Process scheduling is the function of the process management that deals with removing the active process from the CPU and choosing a different process based on a specific strategy.
  • Multiprogramming operating systems require process scheduling to function.

To learn more about scheduling, refer to:

https://brainly.com/question/17189205

#SPJ4